Single award · grant
SR15 (US17) from South of Spring ST to Lake Winona Rd; Add Lanes & Reconstruct; Construction
Award ID: 693JJ22330000Y800FLD522060
A single federal award, with both ends of the trail linked.
$15.1M
Total award value
Award 693JJ22330000Y800FLD522060 is a grant from the Department of Transportation to State of Florida Department of Transportation, $15.1M obligated, for SR15 (US17) from South of Spring ST to Lake Winona Rd; Add Lanes & Reconstruct; Construction. The work is performed in Florida. Source
Description
Project Title: SR15 (US17) from South of Spring ST to Lake Winona Rd; Add Lanes & Reconstruct; Construction :::: Project Description: SR15 (US17) from South of Spring ST to Lake Winona Rd; Add Lanes & Reconstruct; Construction
Award details
Award typeGrant
FAIN693JJ22330000Y800FLD522060
Action date—
Period—
Awarding agencyDepartment of Transportation →
Place of performanceFlorida →
Category—
Competed?Not recordedSource
Total (exact)$15,086,451
More awards to State of Florida Department of Transportation
More from Department of Transportation
awarded 2022$15.6B
awarded 2022$6.2B
awarded 2022$5.9B
awarded 2021$4.1B
awarded 2020$4B
Why the labels? The graph is only worth anything if the links are trusted. Facts taken straight from a federal filing are Source; figures we calculate are Computed; links we infer (corporate parents, districts, similar contractors, connections between records) are Inferred, worded carefully, never asserted as fact and never a claim that one thing caused another. Spot an error? Tell us.