Single award · contract
SM-6 Block I Long Lead Material
Award ID: N0002413C5407
A single federal award, with both ends of the trail linked.
$586.8M
Total award value
Award N0002413C5407 is a contract from the Department of Defense to Raytheon Company, $586.8M obligated, FY2013 to FY2020, for SM-6 Block I Long Lead Material. The work is performed in Arizona. It is classified as NAICS 336414 (Guided Missile and Space Vehicle Manufacturing) and PSC 1410 (Guided Missiles). Source
Agency ›
Department of Defense
Source
awarded→$586.8M
Recipient ›
Raytheon Company
Source
performed in→
Award details
Award typeContract
PIIDN0002413C5407
Action date2013
Period92 mo
Awarding agencyDepartment of Defense →
RecipientRaytheon Company →
Place of performanceArizona →
CategoryNAICS 336414PSC 1410
Competed?Not recordedSource
Total (exact)$586,762,639
More awards to Raytheon Company
awarded 2025$3.4B
awarded 2024$3.3B
awarded 2024$3.1B
awarded 2015$2.8B
awarded 2023$2.5B
More from Department of Defense
awarded 2016$51.3B
awarded 2017$35.7B
awarded 2017$35.1B
awarded 2001$34.2B
awarded 2011$32B
Why the labels? The graph is only worth anything if the links are trusted. Facts taken straight from a federal filing are Source; figures we calculate are Computed; links we infer (corporate parents, districts, similar contractors, connections between records) are Inferred, worded carefully, never asserted as fact and never a claim that one thing caused another. Spot an error? Tell us.