● Single award · contract
Sacramento Weir Widening Will Reduce Water Surface Elevation in Sacramento River and Allow Water to Flow Into…
A single federal award, with both ends of the trail linked.
$184.4M
total award value
2023
action date
42 mo
period
W9123823C0014
PIID
Description
The Sacramento Weir Widening Will Reduce Water Surface Elevation in Sacramento River and Allow Water to Flow Into the Yolo Bypass System. Project Consists of Construction of a Passive Weir, Levee Setback, Fish Passage Control Among Others.
Awarding agencyDepartment of Defense →
RecipientGranite Construction Company →
Place of performanceCalifornia →
CategoryNAICS 237990PSC Y1PZ
Competed?Not recorded✓ from source
Total (exact)$184,426,568
More awards to Granite Construction Company
awarded 2025$193.7M
More from Department of Defense
awarded 2016$51.3B
awarded 2017$35.1B
awarded 2017$34.9B
awarded 2001$34.2B
awarded 2011$32B
🔎
Why the labels? The graph is only worth anything if the links are trusted. Facts taken straight from a federal filing are ✓ from source; anything we compute or infer (corporate parents, districts, competitors) is ≈ inferred and worded carefully, never asserted as fact.