TheFiscalFinder
Single award · contract

Sacramento Weir Widening Will Reduce Water Surface Elevation in Sacramento River and Allow Water to Flow Into…

A single federal award, with both ends of the trail linked.
$184.4M
total award value
2023
action date
42 mo
period
W9123823C0014
PIID

Description

The Sacramento Weir Widening Will Reduce Water Surface Elevation in Sacramento River and Allow Water to Flow Into the Yolo Bypass System. Project Consists of Construction of a Passive Weir, Levee Setback, Fish Passage Control Among Others.

Place of performanceCalifornia
Competed?Not recorded✓ from source
Total (exact)$184,426,568

More awards to Granite Construction Company

More from Department of Defense

awarded 2016$51.3B
awarded 2001$34.2B
🔎
Why the labels? The graph is only worth anything if the links are trusted. Facts taken straight from a federal filing are ✓ from source; anything we compute or infer (corporate parents, districts, competitors) is ≈ inferred and worded carefully, never asserted as fact.