Replace the Existing San Juan Creek Bridge Built in 1916. ; Activities Performed: Replacement of the Existing…
FY2021 · complete year · data as of 2026-07-12
A single federal award, with both ends of the trail linked.
Award CA-2021-206 is a grant from the Department of Transportation, $37.3M obligated, FY2021 to FY2028, for Replace the Existing San Juan Creek Bridge Built in 1916. ; Activities Performed: Replacement of…. The work is performed in California. Source
Description
Application Purpose: The Purpose of This Grant Is to Replace the Existing San Juan Creek Bridge Built in 1916. ; Activities Performed: Replacement of the Existing Bridge at MP 197.9 Is in the City of San Juan Capistrano Near the Camino Capistrano Exit of the Interstate 5 Freeway. The Railroad Bridge Crosses Over San Juan Creek Between Control Point (CP) Oso at Mile Point (MP) 196.1 and CP Capistrano at MP 198 on the Orange Subdivision Owned by the Orange County Transportation Authority (Octa). The Project Involves Replacing an OCTA-Owned Three-Span Steel Railroad Bridge Supported by Timber Piles Along the Pacific Surfliner/Los Angeles to San Diego (Lossan) Rail. Once the Rail Traffic Is Re-Routed to the New Bridge the Existing Bridge Will Be Demolished and New Substructures Will Be Built for a Future Second Track Over San Juan Creek; Expected Outcomes: The Project Will Replace a 105-YEAR-OLD Bridge to Ensure Continued Safe Operation Over the San Juan Creek. Intended Beneficiaries: Riders on the Orange County Line as Well as Train Operators and Conductors.; Intended Beneficiaries: Riders on the Orange County Line as Well as Train Operations and Conductors; Subrecipient Activities: AS a Direct Recipient of Suballocated Funds Metrolink Does Not Intend to Subaward Funds.