TheFiscalFinder
● Single award · grant

Reconstruct Airfield Drainage/Erosion Control

FY2026 · complete year · data as of 2026-10-01†

† DoD contract data posts to USAspending about 90 days after award.

A single federal award, with both ends of the trail linked.
$40.3M
total award value
2026
action date
48 mo
period
34801921342026
FAIN

Description

Purpose: Reconstruct Airfield Drainage/Erosion Control. Activities to Be Performed/Expected Outcomes: This Project Reconstructs Existing Airfield Drainage Lines, Maintaining Airfield Operations During Inclement Weather, That Have Reached the End of Their Useful Lives. This Grant Funds a Portion of Phase 2, Which Consists of the Construction of Stormline S and Partial Construction of Stormline M. This Grant Is Associated with an Airport Safety and Resilient Infrastructure Discretionary Program Grant That Funds the Remaining Eligible Portion of the Phase. Intended Beneficiary: This Grant Will Provide Federal Funding for Airports Associated with San Antonio, Texas.

Place of performanceTexas →
Category—
Competed?Not recordedSource
Total (exact)$40,250,959

More awards to City of San Antonio

awarded 2013$123.6M
awarded 2020$39.7M

More from Department of Transportation

awarded 2022$15.6B
awarded 2022$6.2B
awarded 2022$5.9B
awarded 2021$4.1B
🔎
Why the labels? The graph is only worth anything if the links are trusted. Facts taken straight from a federal filing are Source; figures we calculate are Computed; links we infer (corporate parents, districts, similar contractors, connections between records) are Inferred, worded carefully, never asserted as fact and never a claim that one thing caused another. Spot an error? Tell us.