Recipient Will Conduct Environmental Review, Preliminary Engineering, Final Design, and Construction…
FY2026 ended Sep 30 · data still posting · data as of 2026-11-01†
† DoD contract data posts to USAspending about 90 days after award.
A single federal award, with both ends of the trail linked.
Award 69A36526422740CRSSD is a grant from the Department of Transportation, $17.6M obligated, FY2026 to FY2029, for Recipient Will Conduct Environmental Review, Preliminary Engineering, Final Design, and…. The work is performed in South Dakota. Source
Description
The Recipient Will Conduct Environmental Review, Preliminary Engineering, Final Design, and Construction Activities, to Eliminate Safety Hazards Caused by Inadequate Track Structure on a Segment of Rail Owned and Operated by Dakota, Minnesota Valley & Western Railroad (Dmvw). The Scope of Work Includes Replacing Four Switches, Installing Four New Concrete Crossings, Laying Approximately 27,500 New Ties and 55,000 Tons of Ballast, Correcting Skewed Ties, Surfacing and Anchor Replacement, and Installing Approximately 9.2 Track Miles of 115-POUND Jointed Rail. These Upgrades Will Maintain the Line in a State of Good Repair, Enhance Dmvw?s Resilience, and Ensure the Safe, Consistent Movement of 286K Railcars. By Improving the Overall Safety and Resiliency of the Dmvw Britton Line, the Project Will Strengthen the Economic Vitality and Competitiveness of the Industries IT Serves.