Project Funds Nepa, Preliminary Engineering, Final Design, and Construction of the Interim Repairs That Will…
FY2025 · complete year · data as of 2026-09-01
A single federal award, with both ends of the trail linked.
Award 69A36525420990FSPCT is a grant from the Department of Transportation to Department of Transportation Connecticut, $119.3M obligated, FY2025 to FY2028, for Project Funds Nepa, Preliminary Engineering, Final Design, and Construction of the Interim Repairs…. The work is performed in Connecticut. Source
Description
The Project Funds Nepa, Preliminary Engineering, Final Design, and Construction of the Interim Repairs That Will Allow the Devon Bridge to Remain in Service for Another 10 to 15 Years Until the Bridge Can Be Fully Replaced. The Interim Repairs Will Focus on 1) Addressing the Deficiencies in Certain Members of the Bridge, Especially the Fatigue Prone Detailing of the Ganged Eyebar Assemblies in the Pin-Connected Baltimore Truss in Spans 5, 6 7 and 2) Mechanical and Electrical Parts Used to Open and Close the Scherzer Rolling Lift Bascule Span. The Interim Repairs Are Necessary to Avoid Having the Bridge Taken Out of Service a Situation That Would Shut Down Rail Service for a Significant Portion of the Nec.