Single award · contract
Procure Long Lead Time Material (LLTM), Advanced Engineering and Planning Services and Special Studies
Award ID: N0002410C2229
A single federal award, with both ends of the trail linked.
$2.7B
Total award value
Award N0002410C2229 is a contract from the Department of Defense to Huntington Ingalls Incorporated, $2.7B obligated, FY2010 to FY2020, for Procure Long Lead Time Material (LLTM), Advanced Engineering and Planning Services and Special…. The work is performed in Mississippi. It is classified as NAICS 336611 (Ship Building and Repairing) and PSC 1911 (Amphibious Assault Ships). Source
Description
Procure Long Lead Time Material (LLTM), Advanced Engineering and Planning Services and Special Studies.
Award details
Award typeContract
PIIDN0002410C2229
Action date2010
Period114 mo
Awarding agencyDepartment of Defense →
RecipientHuntington Ingalls Incorporated →
Place of performanceMississippi →
CategoryNAICS 336611PSC 1911
Competed?Not recordedSource
Total (exact)$2,704,759,379
More awards to Huntington Ingalls Incorporated
awarded 2006$10B
awarded 2023$8.3B
awarded 2018$7B
awarded 2018$4.7B
More from Department of Defense
awarded 2016$51.3B
awarded 2017$35.7B
awarded 2017$35.1B
awarded 2001$34.2B
awarded 2011$32B
Why the labels? The graph is only worth anything if the links are trusted. Facts taken straight from a federal filing are Source; figures we calculate are Computed; links we infer (corporate parents, districts, similar contractors, connections between records) are Inferred, worded carefully, never asserted as fact and never a claim that one thing caused another. Spot an error? Tell us.