Preventive Maintenance on Ih 35,US 83, and US 59
FY2026 ended Sep 30 · data still posting · data as of 2026-11-01†
† DoD contract data posts to USAspending about 90 days after award.
A single federal award, with both ends of the trail linked.
Award 693JJ22630000Y001TX2026635 is a grant from the Department of Transportation to Texas Department of Transportation, $15.7M obligated, FY2026 to FY2035, for Preventive Maintenance on Ih 35,US 83, and US 59. The work is performed in Texas. Source
Description
Project Title: Preventive Maintenance on Ih 35,US 83, and US 59. :::: Project Description: Ih 35 from FM 133 North Bound to 0.287 Miles South of FM 3408, and from 0.212 Miles South of Sanchez North Bound Main Lane to 0.28 Miles South of Shiloh Drive; US 83 from Palo Blanco North Bound to Cielito Lindo Boulevard; US 59 from 0.09 Miles West of SH 44 Intersection to Webb/Duval County Line; Resurface of Existing Roadway Mill/Inlay, Spotbase Repair, and Pavement Marking.