TheFiscalFinder
Single award · contract

Operation and Maintenance of the South Bay Wastewater Treatment Plant

A single federal award, with both ends of the trail linked.
$88M
total award value
2020
action date
66 mo
period
191BWC20C0003
PIID

Description

Operation and Maintenance of the South Bay Wastewater Treatment Plant.

RecipientOutside our Phase 1 contractor set: see methodology
Place of performanceCalifornia
Competed?Not recorded✓ from source
Total (exact)$87,960,473

More from Department of State

awarded 2023$1B
🔎
Why the labels? The graph is only worth anything if the links are trusted. Facts taken straight from a federal filing are ✓ from source; anything we compute or infer (corporate parents, districts, competitors) is ≈ inferred and worded carefully, never asserted as fact.