$16.2M
Total award value

Award 69A36522403590BLDIL is a grant from the Department of Transportation, $16.2M obligated, FY2022 to FY2027, for Objective of This Project Is to Complete Final Design and Construction of an Underpassbeneath the…. The work is performed in Illinois. Source

Description

The Objective of This Project Is to Complete Final Design and Construction of an Underpassbeneath the Union Pacific Railroad Uprr Tracks at the Uptown Normal Intermodalpassenger Rail Station Milepost 124 10 Property in the Project Area Is Owned by the Town of Normal Except for the Track and Land Beneath the Track Which Is Owned by Uprr Theunderpass Will Include a Tunnel to Access the Main Station Area on the North Side of the Tracksand the Platform and Waiting Area on the South Side of the Tracks Without the Need to Cross the Tracks at Grade the Underpass Will Also Provide Access for Pedestrians and Bicyclistsbetween the North and South Uptown Station Area Plazas the Design Will Provide for Adacompliant Access as Required

Award details

Award typeGrant
FAIN69A36522403590BLDIL
Action date2022
Period62 mo
RecipientOutside our Phase 1 contractor set: see methodology
Place of performanceIllinois →
Category—
Competed?Not recordedSource
Total (exact)$16,157,375

More from Department of Transportation

awarded 2022$15.6B
awarded 2022$6.2B
awarded 2022$5.9B
awarded 2021$4.1B
Why the labels? The graph is only worth anything if the links are trusted. Facts taken straight from a federal filing are Source; figures we calculate are Computed; links we infer (corporate parents, districts, similar contractors, connections between records) are Inferred, worded carefully, never asserted as fact and never a claim that one thing caused another. Spot an error? Tell us.