Single award · grant

Objective of the Burbank Corridor Speed and Safety Improvements Is to Improve Train Control Systems in the…

Award ID: 69A36522403150CRSCA

FY2022 · complete year · data as of 2026-07-11

A single federal award, with both ends of the trail linked.

$18.4M
Total award value

Award 69A36522403150CRSCA is a grant from the Department of Transportation, $18.4M obligated, FY2022 to FY2029, for Objective of the Burbank Corridor Speed and Safety Improvements Is to Improve Train Control Systems…. The work is performed in California. Source

Description

The Objective of the Burbank Corridor Speed and Safety Improvements Is to Improve Train Control Systems in the Congested Burbank to Los Angeles Segment, Shared by Amtrak, Metrolink, and Uprr, Enhance Safety and Train Throughput at Two Metrolink Stations and Crossings, and Improve Reliability and Safety by Replacing Aging Track and Structures.

Award details

Award typeGrant
FAIN69A36522403150CRSCA
Action date2021
Period94 mo
RecipientOutside our Phase 1 contractor set: see methodology
Place of performanceCalifornia →
Category—
Competed?Not recordedSource
Total (exact)$18,380,848

More from Department of Transportation

awarded 2022$15.6B
awarded 2022$6.2B
awarded 2022$5.9B
awarded 2021$4.1B
Why the labels? The graph is only worth anything if the links are trusted. Facts taken straight from a federal filing are Source; figures we calculate are Computed; links we infer (corporate parents, districts, similar contractors, connections between records) are Inferred, worded carefully, never asserted as fact and never a claim that one thing caused another. Spot an error? Tell us.