TheFiscalFinder
Single award · contract

Nustar Is a Pricipal Investigator (Pi)-Led Small Explorer (Smex) Mission That Performs Surveys and Pointed…

A single federal award, with both ends of the trail linked.
$139.4M
total award value
2008
action date
243 mo
period
NNG08FD60C
PIID

Description

Nustar Is a Pricipal Investigator (Pi)-Led Small Explorer (Smex) Mission That Performs Surveys and Pointed Observations. This Acquisition Is in Response to HQ Ao NNG07ZDA003O and Extends the Bridge Phase B Effort from March 1, 2008 to June 30, 2008. During This Period, the Contractor Shall: 1. Manage the Proposed Nustar Tasks, Provide Cost and Schedule Information to NASA as Required; 2. Work with JPL to Develop the Nustar Project Requirements to Be Ready for System Requirements Review (Ssr). 3. Design the Focal Plane Assembly, Perform Required Analyses, Identify All Long Lead Parts, and Initiate Long Lead Procurements as Required. 4. Design the Instrument Enclosures, Shield, and Aperture, Perform Required Analyses, Identify All Long Lead Items, and Initiate Long Lead Procurements as Required. 5. Complete the Glass Production Facility, Produce the Nustar Glasses to Verify the Production Capability. 6. Develop Prototypes for the Optics Assembly, Design the Optics Assembly and the Production Facility, and Perform Required Analysis. 7. Complete the Preliminary Design of the Mast, Canister and Instrument Structure, Identify Long Lead Procurements. 8. Complete the Spacecraft Requirements, Perform System Engineering Analyses, and Continue the Baseline Spacecraft Design. 9. Complete the Mos (Mission Operations System) Requirements and the Preliminary Mos Plan.

Place of performanceCalifornia
Competed?Not recorded✓ from source
Total (exact)$139,386,816

More awards to California Institute of Technology

awarded 2023$70.4M

More from National Aeronautics and Space Administration

awarded 1993$22.4B
🔎
Why the labels? The graph is only worth anything if the links are trusted. Facts taken straight from a federal filing are ✓ from source; anything we compute or infer (corporate parents, districts, competitors) is ≈ inferred and worded carefully, never asserted as fact.