Single award · contract

NSC 3 Long Lead-Time Material

Award ID: HSCG2306J2DW195

A single federal award, with both ends of the trail linked.

$75M
Total award value

Award HSCG2306J2DW195 is a contract from the Department of Homeland Security, $75M obligated, FY2006 to FY2008, for NSC 3 Long Lead-Time Material. The work is performed in Virginia. It is classified as NAICS 334511 (Search, Detection, Navigation, Guidance, Aeronautical, and Nautical System and Instrument Manufacturing) and PSC 5825 (Radio Navigation Equipment, Except Airborne). Source

Award details

Award typeContract
PIIDHSCG2306J2DW195
Action date2006
Period28 mo
RecipientOutside our Phase 1 contractor set: see methodology
Place of performanceVirginia →
Competed?Not recordedSource
Total (exact)$75,025,462

More from Department of Homeland Security

Why the labels? The graph is only worth anything if the links are trusted. Facts taken straight from a federal filing are Source; figures we calculate are Computed; links we infer (corporate parents, districts, similar contractors, connections between records) are Inferred, worded carefully, never asserted as fact and never a claim that one thing caused another. Spot an error? Tell us.