National Electric Vehicle Infrastructure (Nevi) – South- Design Build-Construction
FY2026 ended Sep 30 · data still posting · data as of 2026-11-01†
† DoD contract data posts to USAspending about 90 days after award.
A single federal award, with both ends of the trail linked.
Award 693JJ22630000Y137NJF00S186 is a grant from the Department of Transportation to New Jersey Dept of Transportation, $15.9M obligated, FY2026 to FY2036, for National Electric Vehicle Infrastructure (Nevi) – South- Design Build-Construction. The work is performed in New Jersey. Source
Description
Project Title: National Electric Vehicle Infrastructure (Nevi) – South- Design Build-Construction :::: Project Description: National Electric Vehicle Infrastructure (Nevi) – South, Counties of Mercer, Monmouth, Ocean, Burlington, Camden, Gloucester, Salem, Cumberland, Atlantic, and Cape May -Design Build-Construction