Single award · contract

MH-47G Blkii Lot 6 Long Lead Production

Award ID: H9224122F0073

FY2022 · complete year · data as of 2026-07-11

A single federal award, with both ends of the trail linked.

$728.2M
Total award value

Award H9224122F0073 is a contract from the Department of Defense to The Boeing Company, $728.2M obligated, FY2022 to FY2026, for MH-47G Blkii Lot 6 Long Lead Production. The work is performed in Pennsylvania. It is classified as NAICS 336411 (Aircraft Manufacturing) and PSC 1520 (Aircraft, Rotary Wing). Source

Award details

Award typeContract
PIIDH9224122F0073
Action date2022
Period48 mo
Place of performancePennsylvania →
Competed?Not recordedSource
Total (exact)$728,175,478

More awards to The Boeing Company

awarded 2003$1.6B

More from Department of Defense

awarded 2016$51.3B
awarded 2001$34.2B
Why the labels? The graph is only worth anything if the links are trusted. Facts taken straight from a federal filing are Source; figures we calculate are Computed; links we infer (corporate parents, districts, similar contractors, connections between records) are Inferred, worded carefully, never asserted as fact and never a claim that one thing caused another. Spot an error? Tell us.