TheFiscalFinder
Single award · contract

Manufacture and Delivery of the Following Firm Requirements: 710 AGM-114K Hfii Heat Missiles, 18 AGM-114M…

A single federal award, with both ends of the trail linked.
$1.3B
total award value
2008
action date
107 mo
period
W31P4Q08C0361
PIID

Description

This Contract Is for the Manufacture and Delivery of the Following Firm Requirements: 710 AGM-114K Hfii Heat Missiles, 18 AGM-114M Hfii Bfwms, 532 AGM-114N Hfii Mac Warhead Missiles, 20 ATM-114K Hfii Smoke Charge Air Training Missiles, 170 ATM-114Q Hfii Mass Simulant Air Training Missiles, and 3 TGM-M36E Hfii Training Guided Missiles. IT Is Also to Establish FFP Range Options for All of the Above Mentioned Variants as Well as the AGM-114P Hfii Predator Missiles; FFP Range Options for the Following Missile Conversions: AGM-114K to AGM-114K-1A, AGM-114K to AGM-114K-2A, AGM-114K to AGM-114M, AGM-114K to AGM-114N, AGM-114K to AGM-114P, AGM-114K to ATM-114K Smoke Charge Air Training Missile, AGM-114K to AGM-114Q Mass Simulant Air Training Missile, and AGM-114N to AGM-114N-6; the Establishment of FFP Options for the Conduct of Quality Assurance Lot Verification Testing (Qalvt) Flight Tests, Qalvt Flight Test Hardware, and Guidance Section Test Articles for Independent Government Test & Evaluation; the Establishment of Nte Options for Production Ramp-Up to 400 Tactical Units Per Month, Unplanned First Article Testing for Warheads, Esafs, and the Predator Gyroscope; the Establishment of Unpriced Options for Refurbishment of Special Tooling/Special Test Equipment, and 29 Different Hfii Missile Spare Parts.

RecipientOutside our Phase 1 contractor set: see methodology
Place of performanceFlorida
Competed?Not recorded✓ from source
Total (exact)$1,297,838,861

More from Department of Defense

awarded 2016$51.3B
awarded 2001$34.2B
🔎
Why the labels? The graph is only worth anything if the links are trusted. Facts taken straight from a federal filing are ✓ from source; figures we calculate are ≈ computed; links we infer (corporate parents, districts, competitors, connections between records) are ≈ inferred, worded carefully, never asserted as fact and never a claim that one thing caused another. Spot an error? Tell us.