Single award · contract

LPD 28 Long Lead Time Material

Award ID: N0002416C2431

A single federal award, with both ends of the trail linked.

$3B
Total award value

Award N0002416C2431 is a contract from the Department of Defense to Huntington Ingalls Incorporated, $3B obligated, FY2016 to FY2026, for LPD 28 Long Lead Time Material. The work is performed in Mississippi. It is classified as NAICS 336611 (Ship Building and Repairing) and PSC 1905 (Combat Ships and Landing Vessels). Source

Award details

Award typeContract
PIIDN0002416C2431
Action date2015
Period120 mo
Place of performanceMississippi →
Competed?Not recordedSource
Total (exact)$2,997,306,666

More awards to Huntington Ingalls Incorporated

awarded 2018$4.7B

More from Department of Defense

awarded 2016$51.3B
awarded 2001$34.2B
Why the labels? The graph is only worth anything if the links are trusted. Facts taken straight from a federal filing are Source; figures we calculate are Computed; links we infer (corporate parents, districts, similar contractors, connections between records) are Inferred, worded carefully, never asserted as fact and never a claim that one thing caused another. Spot an error? Tell us.