Single award · contract

Lot 9 UH-1Y and AH-1Z AAC Contract for Long-Lead Items

Award ID: N0001911C0023

A single federal award, with both ends of the trail linked.

$474.5M
Total award value

Award N0001911C0023 is a contract from the Department of Defense to Bell Textron Inc, $474.5M obligated, FY2011 to FY2016, for Lot 9 UH-1Y and AH-1Z AAC Contract for Long-Lead Items. The work is performed in Texas. It is classified as NAICS 336411 (Aircraft Manufacturing) and PSC 1520 (Aircraft, Rotary Wing). Source

Description

Lot 9 UH-1Y and AH-1Z AAC Contract for Long-Lead Items.

Award details

Award typeContract
PIIDN0001911C0023
Action date2011
Period61 mo
Place of performanceTexas →
Competed?Not recordedSource
Total (exact)$474,464,373

More awards to Bell Textron Inc

awarded 2017$1.2B
awarded 1999$1B
awarded 2006$740.3M

More from Department of Defense

awarded 2016$51.3B
awarded 2001$34.2B
Why the labels? The graph is only worth anything if the links are trusted. Facts taken straight from a federal filing are Source; figures we calculate are Computed; links we infer (corporate parents, districts, similar contractors, connections between records) are Inferred, worded carefully, never asserted as fact and never a claim that one thing caused another. Spot an error? Tell us.