Single award · contract
Lot 10 UH-1Y and AH-1Z AAC Contract for Long Lead AAC
Award ID: N0001912C0009
A single federal award, with both ends of the trail linked.
$542.9M
Total award value
Award N0001912C0009 is a contract from the Department of Defense to Bell Textron Inc, $542.9M obligated, FY2012 to FY2017, for Lot 10 UH-1Y and AH-1Z AAC Contract for Long Lead AAC. The work is performed in Texas. It is classified as NAICS 336411 (Aircraft Manufacturing) and PSC 1520 (Aircraft, Rotary Wing). Source
Agency ›
Department of Defense
Source
awarded→$542.9M
Recipient ›
Bell Textron Inc
Source
performed in→
Award details
Award typeContract
PIIDN0001912C0009
Action date2012
Period63 mo
Awarding agencyDepartment of Defense →
RecipientBell Textron Inc →
Place of performanceTexas →
CategoryNAICS 336411PSC 1520
Competed?Not recordedSource
Total (exact)$542,850,813
More awards to Bell Textron Inc
awarded 2013$1.8B
awarded 2017$1.2B
awarded 1999$1B
awarded 2006$740.3M
More from Department of Defense
awarded 2016$51.3B
awarded 2017$35.7B
awarded 2017$35.1B
awarded 2001$34.2B
awarded 2011$32B
Why the labels? The graph is only worth anything if the links are trusted. Facts taken straight from a federal filing are Source; figures we calculate are Computed; links we infer (corporate parents, districts, similar contractors, connections between records) are Inferred, worded carefully, never asserted as fact and never a claim that one thing caused another. Spot an error? Tell us.