Single award · contract

Long Lead Time Materials (LLTM)

Award ID: N0002424C6200

FY2024 · complete year · data as of 2026-07-03

A single federal award, with both ends of the trail linked.

$130.3M
Total award value

Award N0002424C6200 is a contract from the Department of Defense to L3 Technologies Inc, $130.3M obligated, FY2024 to FY2030, for Long Lead Time Materials (LLTM). The work is performed in Maryland. It is classified as NAICS 334511 (Search, Detection, Navigation, Guidance, Aeronautical, and Nautical System and Instrument Manufacturing) and PSC 5845 (Underwater Sound Equipment). Source

Award details

Award typeContract
PIIDN0002424C6200
Action date2024
Period65 mo
Place of performanceMaryland →
Competed?Not recordedSource
Total (exact)$130,278,718

More awards to L3 Technologies Inc

More from Department of Defense

awarded 2016$51.3B
awarded 2001$34.2B
Why the labels? The graph is only worth anything if the links are trusted. Facts taken straight from a federal filing are Source; figures we calculate are Computed; links we infer (corporate parents, districts, similar contractors, connections between records) are Inferred, worded carefully, never asserted as fact and never a claim that one thing caused another. Spot an error? Tell us.