Single award · contract

Long Lead Time Material (Scn Funds)

Award ID: N0002409C4137

A single federal award, with both ends of the trail linked.

$129.5M
Total award value

Award N0002409C4137 is a contract from the Department of Defense to BAE Systems Land & Armaments L.p., $129.5M obligated, FY2009 to FY2018, for Long Lead Time Material (Scn Funds). The work is performed in Minnesota. It is classified as NAICS 336611 (Ship Building and Repairing) and PSC 1904 (Submarines). Source

Award details

Award typeContract
PIIDN0002409C4137
Action date2009
Period100 mo
Place of performanceMinnesota →
Competed?Not recordedSource
Total (exact)$129,488,550

More awards to BAE Systems Land & Armaments L.p.

awarded 2005$1.1B
awarded 2019$247.8M
awarded 2015$203.4M

More from Department of Defense

awarded 2016$51.3B
awarded 2001$34.2B
Why the labels? The graph is only worth anything if the links are trusted. Facts taken straight from a federal filing are Source; figures we calculate are Computed; links we infer (corporate parents, districts, similar contractors, connections between records) are Inferred, worded carefully, never asserted as fact and never a claim that one thing caused another. Spot an error? Tell us.