Single award · contract

Long Lead Time Material (LLTM) for National Security Cutter (NSC) 9

Award ID: HSCG2316CADB016

A single federal award, with both ends of the trail linked.

$1.5B
Total award value

Award HSCG2316CADB016 is a contract from the Department of Homeland Security to Huntington Ingalls Incorporated, $1.5B obligated, FY2016 to FY2028, for Long Lead Time Material (LLTM) for National Security Cutter (NSC) 9. The work is performed in Mississippi. It is classified as NAICS 336611 (Ship Building and Repairing) and PSC 1990 (Miscellaneous Vessels). Source

Award details

Award typeContract
PIIDHSCG2316CADB016
Action date2016
Period143 mo
Place of performanceMississippi →
Competed?Not recordedSource
Total (exact)$1,460,701,663

More awards to Huntington Ingalls Incorporated

awarded 2018$4.7B

More from Department of Homeland Security

Why the labels? The graph is only worth anything if the links are trusted. Facts taken straight from a federal filing are Source; figures we calculate are Computed; links we infer (corporate parents, districts, similar contractors, connections between records) are Inferred, worded carefully, never asserted as fact and never a claim that one thing caused another. Spot an error? Tell us.