Single award · contract

Long-Lead-Time Material for LPD 26 Integrated Shipboard Electronics

Award ID: N0002411C2404

A single federal award, with both ends of the trail linked.

$128.9M
Total award value

Award N0002411C2404 is a contract from the Department of Defense, $128.9M obligated, FY2011 to FY2019, for Long-Lead-Time Material for LPD 26 Integrated Shipboard Electronics. The work is performed in California. It is classified as NAICS 336611 (Ship Building and Repairing) and PSC 1911 (Amphibious Assault Ships). Source

Award details

Award typeContract
PIIDN0002411C2404
Action date2010
Period98 mo
RecipientOutside our Phase 1 contractor set: see methodology
Place of performanceCalifornia →
Competed?Not recordedSource
Total (exact)$128,916,860

More from Department of Defense

awarded 2016$51.3B
awarded 2001$34.2B
Why the labels? The graph is only worth anything if the links are trusted. Facts taken straight from a federal filing are Source; figures we calculate are Computed; links we infer (corporate parents, districts, similar contractors, connections between records) are Inferred, worded carefully, never asserted as fact and never a claim that one thing caused another. Spot an error? Tell us.