Single award · contract

Long Lead MH-47G Blkii Lot 3 Production

Award ID: H9224119F0091

A single federal award, with both ends of the trail linked.

$297M
Total award value

Award H9224119F0091 is a contract from the Department of Defense to The Boeing Company, $297M obligated, FY2019 to FY2026, for Long Lead MH-47G Blkii Lot 3 Production. The work is performed in Pennsylvania. It is classified as NAICS 336411 (Aircraft Manufacturing) and PSC 1520 (Aircraft, Rotary Wing). Source

Award details

Award typeContract
PIIDH9224119F0091
Action date2019
Period78 mo
Place of performancePennsylvania →
Competed?Not recordedSource
Total (exact)$297,044,706

More awards to The Boeing Company

awarded 2003$1.6B

More from Department of Defense

awarded 2016$51.3B
awarded 2001$34.2B
Why the labels? The graph is only worth anything if the links are trusted. Facts taken straight from a federal filing are Source; figures we calculate are Computed; links we infer (corporate parents, districts, similar contractors, connections between records) are Inferred, worded carefully, never asserted as fact and never a claim that one thing caused another. Spot an error? Tell us.