Single award · contract
Long Lead MH-47G Blkii Lot 2 Production
Award ID: H9224118F0031
A single federal award, with both ends of the trail linked.
$257.2M
Total award value
Award H9224118F0031 is a contract from the Department of Defense to The Boeing Company, $257.2M obligated, FY2018 to FY2023, for Long Lead MH-47G Blkii Lot 2 Production. The work is performed in Pennsylvania. It is classified as NAICS 336411 (Aircraft Manufacturing) and PSC 1520 (Aircraft, Rotary Wing). Source
Agency ›
Department of Defense
Source
awarded→$257.2M
Recipient ›
The Boeing Company
Source
performed in→
Award details
Award typeContract
PIIDH9224118F0031
Action date2018
Period62 mo
Awarding agencyDepartment of Defense →
RecipientThe Boeing Company →
Place of performancePennsylvania →
CategoryNAICS 336411PSC 1520
Competed?Not recordedSource
Total (exact)$257,238,906
More awards to The Boeing Company
awarded 2008$4.4B
awarded 2003$1.6B
awarded 2018$1.4B
awarded 2025$995.3M
More from Department of Defense
awarded 2016$51.3B
awarded 2017$35.7B
awarded 2017$35.1B
awarded 2001$34.2B
awarded 2011$32B
Why the labels? The graph is only worth anything if the links are trusted. Facts taken straight from a federal filing are Source; figures we calculate are Computed; links we infer (corporate parents, districts, similar contractors, connections between records) are Inferred, worded carefully, never asserted as fact and never a claim that one thing caused another. Spot an error? Tell us.