Single award · contract

Long Lead Material

Award ID: N0002421C5411

FY2021 · complete year · data as of 2026-07-12

A single federal award, with both ends of the trail linked.

$719.4M
Total award value

Award N0002421C5411 is a contract from the Department of Defense to Raytheon Company, $719.4M obligated, FY2021 to FY2027, for Long Lead Material. The work is performed in Arizona. It is classified as NAICS 336414 (Guided Missile and Space Vehicle Manufacturing) and PSC 1410 (Guided Missiles). Source

Award details

Award typeContract
PIIDN0002421C5411
Action date2021
Period71 mo
Place of performanceArizona →
Competed?Not recordedSource
Total (exact)$719,364,175

More awards to Raytheon Company

More from Department of Defense

awarded 2016$51.3B
awarded 2001$34.2B
Why the labels? The graph is only worth anything if the links are trusted. Facts taken straight from a federal filing are Source; figures we calculate are Computed; links we infer (corporate parents, districts, similar contractors, connections between records) are Inferred, worded carefully, never asserted as fact and never a claim that one thing caused another. Spot an error? Tell us.