Single award · contract

Long Lead Items for FY08 M113 FOV Reset

Award ID: 0024

A single federal award, with both ends of the trail linked.

$93.6M
Total award value

Award 0024 is a contract from the Department of Defense to BAE Systems Land & Armaments L.p., $93.6M obligated, FY2007 to FY2014, for Long Lead Items for FY08 M113 FOV Reset. The work is performed in Alabama. It is classified as NAICS 336992 (Military Armored Vehicle, Tank, and Tank Component Manufacturing) and PSC 2350 (Combat, Assault, and Tactical Vehicles, Tracked). Source

Award details

Award typeContract
PIID0024
Action date2007
Period75 mo
Place of performanceAlabama →
Competed?Not recordedSource
Total (exact)$93,618,413

More awards to BAE Systems Land & Armaments L.p.

awarded 2006$1.6B
awarded 2001$1.3B

More from Department of Defense

awarded 2016$51.3B
awarded 2001$34.2B
Why the labels? The graph is only worth anything if the links are trusted. Facts taken straight from a federal filing are Source; figures we calculate are Computed; links we infer (corporate parents, districts, similar contractors, connections between records) are Inferred, worded carefully, never asserted as fact and never a claim that one thing caused another. Spot an error? Tell us.