Single award · contract

Launcher Long Lead Material Procurement

Award ID: N0003026C1013

FY2026 ended Sep 30 · data still posting · data as of 2026-11-01†

† DoD contract data posts to USAspending about 90 days after award.

A single federal award, with both ends of the trail linked.

$133.1M
Total award value

Award N0003026C1013 is a contract from the Department of Defense to Northrop Grumman Systems Corporation, $133.1M obligated, FY2026 to FY2028, for Launcher Long Lead Material Procurement. The work is performed in District Of Columbia. It is classified as NAICS 541330 (Engineering Services) and PSC L010 (Technical Representative- Weapons). Source

Award details

Award typeContract
PIIDN0003026C1013
Action date2025
Period29 mo
Place of performanceDistrict Of Columbia →
Competed?Not recordedSource
Total (exact)$133,114,946

More awards to Northrop Grumman Systems Corporation

awarded 2015$275.9M
awarded 2020$228.4M

More from Department of Defense

awarded 2016$51.3B
awarded 2001$34.2B
Why the labels? The graph is only worth anything if the links are trusted. Facts taken straight from a federal filing are Source; figures we calculate are Computed; links we infer (corporate parents, districts, similar contractors, connections between records) are Inferred, worded carefully, never asserted as fact and never a claim that one thing caused another. Spot an error? Tell us.