Single award · contract

KSA FMS Obsolescence/Long Lead - Obsolescence Mitigation, Program Infrastructure, Exportability, Long Lead…

Award ID: HQ014719C0008

A single federal award, with both ends of the trail linked.

$350.8M
Total award value

Award HQ014719C0008 is a contract from the Department of Defense to Raytheon Company, $350.8M obligated, FY2019 to FY2024, for KSA FMS Obsolescence/Long Lead - Obsolescence Mitigation, Program Infrastructure, Exportability…. The work is performed in Massachusetts. It is classified as NAICS 334511 (Search, Detection, Navigation, Guidance, Aeronautical, and Nautical System and Instrument Manufacturing) and PSC 5840 (Radar Equipment, Except Airborne). Source

Description

KSA FMS Obsolescence/Long Lead - Obsolescence Mitigation, Program Infrastructure, Exportability, Long Lead Material, and Country Support

Award details

Award typeContract
PIIDHQ014719C0008
Action date2019
Period64 mo
Place of performanceMassachusetts →
Competed?Not recordedSource
Total (exact)$350,788,430

More awards to Raytheon Company

More from Department of Defense

awarded 2016$51.3B
awarded 2001$34.2B
Why the labels? The graph is only worth anything if the links are trusted. Facts taken straight from a federal filing are Source; figures we calculate are Computed; links we infer (corporate parents, districts, similar contractors, connections between records) are Inferred, worded carefully, never asserted as fact and never a claim that one thing caused another. Spot an error? Tell us.