Single award · contract
Joint High Speed Vessel 11 Long Lead Time Material Uca
Award ID: N0002416C2217
A single federal award, with both ends of the trail linked.
$347.4M
Total award value
Award N0002416C2217 is a contract from the Department of Defense to Austal USA, LLC, $347.4M obligated, FY2016 to FY2020, for Joint High Speed Vessel 11 Long Lead Time Material Uca. The work is performed in Alabama. It is classified as NAICS 336611 (Ship Building and Repairing) and PSC 1910 (Transport Vessels, Passenger and Troop). Source
Agency ›
Department of Defense
Source
awarded→$347.4M
Recipient ›
Austal USA, LLC
Source
performed in→
Award details
Award typeContract
PIIDN0002416C2217
Action date2015
Period53 mo
Awarding agencyDepartment of Defense →
RecipientAustal USA, LLC →
Place of performanceAlabama →
CategoryNAICS 336611PSC 1910
Competed?Not recordedSource
Total (exact)$347,366,588
More awards to Austal USA, LLC
awarded 2010$4.5B
awarded 2017$2.8B
awarded 2008$1.7B
awarded 2018$1.3B
More from Department of Defense
awarded 2016$51.3B
awarded 2017$35.7B
awarded 2017$35.1B
awarded 2001$34.2B
awarded 2011$32B
Why the labels? The graph is only worth anything if the links are trusted. Facts taken straight from a federal filing are Source; figures we calculate are Computed; links we infer (corporate parents, districts, similar contractors, connections between records) are Inferred, worded carefully, never asserted as fact and never a claim that one thing caused another. Spot an error? Tell us.