Single award · grant

I-79 Exit 155 Bridge Replacement

Award ID: 693JJ22640000RA16WV0079144

FY2026 ended Sep 30 · data still posting · data as of 2026-11-01†

† DoD contract data posts to USAspending about 90 days after award.

A single federal award, with both ends of the trail linked.

$24.4M
Total award value

Award 693JJ22640000RA16WV0079144 is a grant from the Department of Transportation to Wvdot Division of Highways, $24.4M obligated, FY2026 to FY2031, for I-79 Exit 155 Bridge Replacement. The work is performed in West Virginia. Source

Description

Project Title: I-79 Exit 155 Bridge Replacement :::: Project Description: Monongalia, I 79 - MP 154.817 to MP 154.852, JCT I 79 (0.5 MI S Exit 155 - 0.3 MI N Exit 155), Bridge Replacement, Construction, Discretionary Grant

Award details

Award typeGrant
FAIN693JJ22640000RA16WV0079144
Action date2026
Period58 mo
Place of performanceWest Virginia →
Category—
Competed?Not recordedSource
Total (exact)$24,400,000

More awards to Wvdot Division of Highways

More from Department of Transportation

awarded 2022$15.6B
awarded 2022$6.2B
awarded 2022$5.9B
awarded 2021$4.1B
Why the labels? The graph is only worth anything if the links are trusted. Facts taken straight from a federal filing are Source; figures we calculate are Computed; links we infer (corporate parents, districts, similar contractors, connections between records) are Inferred, worded carefully, never asserted as fact and never a claim that one thing caused another. Spot an error? Tell us.