TheFiscalFinder
Single award · grant

I-494 E-Zpass Project (Msp Airport to US 169) in Bloomington & Richfield

FY2026 · year to date · preliminary · data as of 2026-09-12

DoD contract data posts to USAspending about 90 days after award.

A single federal award, with both ends of the trail linked.
$113M
total award value
2026
action date
120 mo
period
693JJ22640000Y465MNI494013
FAIN

Description

Project Title: I-494 E-Zpass Project (Msp Airport to US 169) in Bloomington & Richfield :::: Project Description: I-494: From 0.3 MI E of US 169 to 0.8 MI W of MN 100, and from I-35W to E of 24TH Ave and on I-35W, from 86TH ST to 76TH ST in Edina, Bloomington and Richfield- Construct E-Zpass Lanes, Mobility and Safety Improvements, Reconstruct Mainline Pavement, Drainage, Ada, Lighting, Sidewalk/Trail, Construct New Bridge 27430, Replace Bridges 9289 (New BR 27425), 9213 (New BR 27429), 9081A & 9081 (New BR 27W58) and 9082 (New BR 27W59), Preservation on Bridges 9078 (Ped Br), 27V63, 27V38, 27052B, 27052D, 27424, 27V33, 27V35 and 27408, Utilities and Replace Signals at France Ave and 82ND ST

Place of performanceMinnesota
Category
Competed?Not recordedSource
Total (exact)$113,001,000

More awards to Minnesota Department of Transportation

More from Department of Transportation

awarded 2022$15.6B
awarded 2022$6.2B
awarded 2022$5.9B
awarded 2021$4.1B
🔎
Why the labels? The graph is only worth anything if the links are trusted. Facts taken straight from a federal filing are Source; figures we calculate are Computed; links we infer (corporate parents, districts, similar contractors, connections between records) are Inferred, worded carefully, never asserted as fact and never a claim that one thing caused another. Spot an error? Tell us.