Single award · contract

H-1 Upgrades Lot 8 AAC for Long Lead Parts

Award ID: N0001910C0015

A single federal award, with both ends of the trail linked.

$600.2M
Total award value

Award N0001910C0015 is a contract from the Department of Defense to Bell Textron Inc, $600.2M obligated, FY2010 to FY2016, for H-1 Upgrades Lot 8 AAC for Long Lead Parts. The work is performed in Texas. It is classified as NAICS 336411 (Aircraft Manufacturing) and PSC 1520 (Aircraft, Rotary Wing). Source

Award details

Award typeContract
PIIDN0001910C0015
Action date2010
Period73 mo
Place of performanceTexas →
Competed?Not recordedSource
Total (exact)$600,210,577

More awards to Bell Textron Inc

awarded 2017$1.2B
awarded 1999$1B
awarded 2006$740.3M

More from Department of Defense

awarded 2016$51.3B
awarded 2001$34.2B
Why the labels? The graph is only worth anything if the links are trusted. Facts taken straight from a federal filing are Source; figures we calculate are Computed; links we infer (corporate parents, districts, similar contractors, connections between records) are Inferred, worded carefully, never asserted as fact and never a claim that one thing caused another. Spot an error? Tell us.