Grant MA-2022-034
Description
Purpose: To Request $97139202 in Federal Funds to Fund Capital Projects Including Replacing Bridges on Dorchester Avenue Systemwide Tunnel Inspections the Expansion and Improvement of Codman Yards Engineering and Design of North Station Drawbridge One Davis Square Signal Improvement Signal Priority for Concord Avenue in Cambridge and for Malden/Everett and Catamaran Overhauls. Funding:section 5307(H) Passenger Ferryffy 2020 - $3500000 (D2020-PFGP-006 D2020-PFGP-007 D2020-PFGP-008)FFY 2021 - $3935140 (D2022-PFGP-008)TOTAL - $74351405337 Fixed Guideway:ffy 2020 -$20296384FFY 2021- $68816259TOTAL - $891126435337 High Intensity Motorbusffy 2020 - $59282FFY 2021 - $48137TOTAL: $107419CMAQ Flex Funds Ffy 2021 - $304000FFY 2022- $180000TOTAL - $484000LOCAL Match Will Be from Mbta Revenue Bonds.activities to Be Performed: - Replace Three (3) Contiguous Bridges Nos. B-16-129 Bins 4VM 8MQ 8RR Along Dorchester Avenue in Boston MA- Periodic Inspection and Rating of the Orange Line Green Line Red Line and Blue Line Tunnels- Traffic Signal Prioritization in Somerville Cambridge and Malden/Everett- Initial Design Work for a North Station Drawbridge Replacement- Progress on Overhauls of Catamarans- Codman Yard Expansion and Improvements Projectexpected Outcomes:these Funds Will Improve Safety Help Replace Much Needed Infrastructure Update a Bus Garage for Electric and Hybrid Vehicles Ensure the Integrity of Subway Tunnels and Help Make Bus Trips Faster and on a More Reliable Schedule. Intended Beneficiaries:residents of the Mbta Service Area Systemwidesubrecipient Activities: Nonethe Mbta Certifies That Projects Funded in This Grant by Section 5337 Funds Are Included in the Transit Asset Management (Tam) Plan Investment Prioritization Section.