Total award value

Award CA-2026-061 is a grant from the Department of Transportation, $15.9M obligated, FY2026 to FY2031. The work is performed in California. Source

Description

Application Purpose: This Application Will Provide Funding Replace Three (3) Existing Public Ferry Terminal Floats Providing Service in the San Francisco Bay. Overall Grant Funding:total FTA Request Is 15900000 (80%) FTA #1: D2024-PFGP-003 060000 2023.24.90.UB.1 - $9469718 (General Fund) Discretionary Id: D2024-PFGP-003FTA #2: D2024-PFGP-004 060000 2023.2J.90.UB.2 - $6430282 (Trust Fund) Discretionary Id: D2024-PFGP-004TOTAL Local Match Is $3975000 (20% in Regional Bridge Tolls)total Eligible Project Cost Is $19875000.; Activities Performed: The Project Would Replace Three (3) of Wetas Ferry Terminal Floats to Improve the Systems State of Good Repair and Ensure Boat Docking for New Vessels.; Expected Outcomes: The Requested Funding Will Support Ftas Priorities Including Connecting Communities Renewing Our Nations Transit Systems and Reducing Vehicle Miles Traveled. The Replacement Floats Under This Funding Request Would Be Made to Existing Infrastructure in the Weta System. The Reduction in Noise Pollution and Air Pollution Resulting from Improvements to the Ferry Service Will Be Substantial.; Intended Beneficiaries: Weta Forecasts That the 2030 Projected Annual Ridership for Walk on Passengers Served by the Project Is 1248000 an Increase of 25% from the 2024 Projected Annual Ridership. Floats Will Be Built in the USA and Will Meet All Buy America Requirements and Foster Growth in Domestic Shipbuilding. The Project Provides Economic Opportunity by Creating Over 2300 Jobs in the Us. Supports Families and Communities by Providing a Safe Reliable Way to Cross the Bay in a Virtually Silent Safe and Fast Ferry. The Project Serves Both Commuters as Well as Families Including Free Fares for Children Under 5 and Half Fares for Kids Until Age 18.; Subrecipient Activities: N/A

Award details

Award typeGrant
FAINCA-2026-061
Action date2026
Period57 mo
RecipientOutside our Phase 1 contractor set: see methodology
Place of performanceCalifornia →
Category—
Competed?Not recordedSource
Total (exact)$15,900,000

More from Department of Transportation

awarded 2022$15.6B
awarded 2022$6.2B
awarded 2022$5.9B
awarded 2021$4.1B
Why the labels? The graph is only worth anything if the links are trusted. Facts taken straight from a federal filing are Source; figures we calculate are Computed; links we infer (corporate parents, districts, similar contractors, connections between records) are Inferred, worded carefully, never asserted as fact and never a claim that one thing caused another. Spot an error? Tell us.