Single award · contract

FY17 SM-6 Long Lead Material

Award ID: N0002417C5409

A single federal award, with both ends of the trail linked.

$563.8M
Total award value

Award N0002417C5409 is a contract from the Department of Defense to Raytheon Company, $563.8M obligated, FY2017 to FY2021, for FY17 SM-6 Long Lead Material. The work is performed in Arizona. It is classified as NAICS 336414 (Guided Missile and Space Vehicle Manufacturing) and PSC 1410 (Guided Missiles). Source

Award details

Award typeContract
PIIDN0002417C5409
Action date2017
Period51 mo
Place of performanceArizona →
Competed?Not recordedSource
Total (exact)$563,794,399

More awards to Raytheon Company

More from Department of Defense

awarded 2016$51.3B
awarded 2001$34.2B
Why the labels? The graph is only worth anything if the links are trusted. Facts taken straight from a federal filing are Source; figures we calculate are Computed; links we infer (corporate parents, districts, similar contractors, connections between records) are Inferred, worded carefully, never asserted as fact and never a claim that one thing caused another. Spot an error? Tell us.