FRA-70/71-12.68/15.16 (Proj 4R)

A single federal award, with both ends of the trail linked.
$54.7M
total award value
action date
period
693JJ22230000Y460OHE190122
FAIN

Description

Project Title: FRA-70/71-12.68/15.16 (Proj 4R) :::: Project Description: Rebuilds 70/71 Eb/NB and Adds an Extra Lane Through the 70/71 Overlap Area. Constructs a New Ramp Onto Fulton ST from 70 E and 71 N. Closes the Existing Ramps from 70 E to Front and 70 E to Livingston Eliminating Weave with 71N Traffic. Widens Structure FRA-70-12.82R(70 Over Souder). New Structures to Carry New Ramps. Replaces Structures: FRA-7013.73R(70 Over Short St) and FRA-13.95C (Front ST Over I-70). Also, Reconstructs Livingston Between Front and High Completing Conversion to Two Way Traffic. Converts Front ST to Two Way Traffic Between Livingston and Mound. Reconstructs Fulton Between Front and High. Build a New Ramp from Mound ST to I-71 S Including a New 4000¿ Structure Over the Scioto River and SR 315. IT Also IT Adds an Additional Lane to the Overlapped Portion of I-70W/71S Providing Two Continuous Lanes of I-71 and I-70 Through Downtown Columbus

Place of performanceOhio
Category
Competed?Not recorded✓ from source
Total (exact)$54,687,470

More awards to Ohio Department of Transportation

More from Department of Transportation

awarded 2022$15.6B
awarded 2022$6.2B
awarded 2022$5.9B
awarded 2021$4.1B
🔎
Why the labels? The graph is only worth anything if the links are trusted. Facts taken straight from a federal filing are ✓ from source; anything we compute or infer (corporate parents, districts, competitors) is ≈ inferred and worded carefully, never asserted as fact.