TheFiscalFinder
Single award · grant

Federal Funding for the Project Included in This Grant Application Is Provided by the Following:surface…

A single federal award, with both ends of the trail linked.
$71.3M
total award value
2021
action date
11 mo
period
CA-2021-166
FAIN

Description

Federal Funding for the Project Included in This Grant Application Is Provided by the Following:surface Transportation Program (Stp) Flexible Funds Transferred to 5310 from the Los Angeles-Long Beach-Santa Ana Uza #60020: $71300000.TOTAL Section Fhwa Transfer to 5310 Ffy 2021 Los Angeles-Long Beach-Santa Ana Uza: $71300000OVERALL Grant Funding: Total Federal Funds (88.53%): $71300000TOTAL Local Match (11.47%): $9237671TOTAL Project Cost: $80537671ACCESS Services Is Hereby Submitting This Grant Application in Support of the Following Capital Projects:this Grant Applies $71300000 of STP Funds (Fhwa Transfer to 5310) to Procure Contractor Services for the Provision of Ada Complementary Paratransit Service in the 6 Different Service Areas Access Services Operates Within Los Angeles County. This Project Will Fund Contracted Service for the Period Between July 1 2021 Through June 30 2022.

RecipientOutside our Phase 1 contractor set: see methodology
Place of performanceCalifornia
Category
Competed?Not recorded✓ from source
Total (exact)$71,300,000

More from Department of Transportation

awarded 2022$15.6B
awarded 2022$6.2B
awarded 2022$5.9B
awarded 2021$4.1B
🔎
Why the labels? The graph is only worth anything if the links are trusted. Facts taken straight from a federal filing are ✓ from source; figures we calculate are ≈ computed; links we infer (corporate parents, districts, competitors, connections between records) are ≈ inferred, worded carefully, never asserted as fact and never a claim that one thing caused another. Spot an error? Tell us.