Extend/Expand Runway; Reconstruct Taxiway Lighting; Strengthen Runway; Reseal/Resurface Runway…
FY2026 ended Sep 30 · data still posting · data as of 2026-11-01†
† DoD contract data posts to USAspending about 90 days after award.
A single federal award, with both ends of the trail linked.
Award 34000640432026 is a grant from the Department of Transportation to University of Oklahoma, $26.8M obligated, FY2026 to FY2030, for Extend/Expand Runway; Reconstruct Taxiway Lighting; Strengthen Runway; Reseal/Resurface Runway…. The work is performed in Oklahoma. Source
Description
Purpose: Extend/Expand Runway; Reconstruct Taxiway Lighting; Strengthen Runway; Reseal/Resurface Runway; Reseal/Resurface Taxiway; Construct Taxiway; Extend/Expand Taxiway; Reconstruct Runway Visual Guidance System; Realign Taxiway. Activities to Be Performed/Expected Outcomes: This Project Constructs New 333 Foot Taxiway C2 to Bring the Airport Into Conformity with Current Standards. This Project Extends Runway 3/21 an Additional 1,000 Feet in Length to Bring the Airport Into Conformity with Current Standards. This Project Extends Runway 36 an Additional 1,791 Feet in Length in Length to Bring the Airport Into Conformity with Current Standards. This Project Extends Taxiway C by an Additional 1,791 Feet in Length to Bring the Airport Into Conformity with Current Standards. This Project Extends Existing Taxiway a by an Additional 900 Feet in Length to Bring the Airport Into Conformity with Current Standards. This Project Realigns Existing Paved Taxiway B by 45 Degrees to Bring the Airport Into Conformity with Current Standards. This Project Reconstructs Existing Taxiways a, B, C, D, & E Lighting That Has Reached the End of Its Useful Life. This Project Reconstructs the Precision Approach Path Indicator System for Runway 18/36, Both Runway Thresholds, That Has Reached the End of Its Useful Life. This Project Reconstructs the Precision Approach Path Indicator System for Runway 3/21, Both Runway Thresholds, That Has Reached the End of Its Useful Life. This Project Reseals 1,833 Feet of Existing Taxiway a Pavement at a Nonprimary Airport to Extend Its Useful Life. This Project Reseals 2,287 Feet of Existing Runway 3/21 Pavement at a Nonprimary Airport to Extend Its Useful Life. This Project Strengthens Existing Runway 18/36 to Bring the Airport Into Conformity with Current Standards. Intended Beneficiary: This Grant Will Provide Federal Funding for Airports Associated with Norman, Oklahoma.