Single award · grant

Expand Terminal Building

Award ID: 34600500752026

FY2026 ended Sep 30 · data still posting · data as of 2026-11-01†

† DoD contract data posts to USAspending about 90 days after award.

A single federal award, with both ends of the trail linked.

$17.8M
Total award value

Award 34600500752026 is a grant from the Department of Transportation, $17.8M obligated, FY2026 to FY2030, for Expand Terminal Building. The work is performed in South Dakota. Source

Description

Purpose: Expand Terminal Building. Activities to Be Performed/Expected Outcomes: This Project Expands the Existing Terminal Building by 53,852 Square Feet. The Expansion Will Accommodate More Aircraft Operations. This Grant Funds a Portion of the Final Phase, Which Consists of Interior and Exterior Finishes on 53,852 Square Feet of Terminal Building and 12,087 Square Feet of Terminal Expansion. This Grant Is Associated with an Airport Infrastructure Grant and Airport Terminal Program Grant That Funds the Remaining Eligible Portion of the Project. Intended Beneficiary: This Grant Will Provide Federal Funding for Airports Associated with Sioux Falls, South Dakota.

Award details

Award typeGrant
FAIN34600500752026
Action date2026
Period47 mo
RecipientOutside our Phase 1 contractor set: see methodology
Place of performanceSouth Dakota →
Category—
Competed?Not recordedSource
Total (exact)$17,780,917

More from Department of Transportation

awarded 2022$15.6B
awarded 2022$6.2B
awarded 2022$5.9B
awarded 2021$4.1B
Why the labels? The graph is only worth anything if the links are trusted. Facts taken straight from a federal filing are Source; figures we calculate are Computed; links we infer (corporate parents, districts, similar contractors, connections between records) are Inferred, worded carefully, never asserted as fact and never a claim that one thing caused another. Spot an error? Tell us.