● Single award · grant
East Hartford - Resurfacing, Bridge & Safety Improvements on Rte 2 from the Charter Oak Bridge Area (Cn)
A single federal award, with both ends of the trail linked.
$68.8M
total award value
—
action date
—
period
693JJ22130000Z0E1CT0032203
FAIN
Description
Project Title: East Hartford - Resurfacing, Bridge & Safety Improvements on Rte 2 from the Charter Oak Bridge Area (Cn) :::: Project Description: East Hartford - Resurfacing, Bridge & Safety Improvements on Rte 2 from the Charter Oak Bridge Area (MP 1.63) to the Maple St. Overpass (MP 3.66) in East Hartford. Improvements Include the Removal of the Cambridge St. WB On-Ramp & the Sutton Ave. Eb Off-Ramp (Exit 5B).
Awarding agencyDepartment of Transportation →
Place of performanceConnecticut →
Category—
Competed?Not recorded✓ from source
Total (exact)$68,814,622
More awards to Department of Transportation Connecticut
awarded 2020$438.7M
awarded 2023$311.6M
awarded 2025$220.4M
More from Department of Transportation
awarded 2022$15.6B
awarded 2022$6.2B
awarded 2022$5.9B
awarded 2021$4.1B
awarded 2020$4B
🔎
Why the labels? The graph is only worth anything if the links are trusted. Facts taken straight from a federal filing are ✓ from source; figures we calculate are ≈ computed; links we infer (corporate parents, districts, competitors, connections between records) are ≈ inferred, worded carefully, never asserted as fact and never a claim that one thing caused another. Spot an error? Tell us.