TheFiscalFinder
Single award · grant

Design, Construct, and Operate a Closed Loop Salt Slag Recycling Unit on the Back End of Real Alloy’s…

A single federal award, with both ends of the trail linked.
$67.3M
total award value
2024
action date
46 mo
period
DECD0000094
FAIN

Description

Design, Construct, and Operate a Closed Loop Salt Slag Recycling Unit on the Back End of Real Alloy’s Existing Aluminum Recycling Milling Facility in Wabash, Indiana. Divert Approximately 70% of Salt Slag Waste Generated at the Wabash Facility from Landfill to Recycling Processes That Produce Marketable or Useable Products (I.e., Marketable Flux, Aluminum Oxide, Ammonium Sulfate, Reusable Hydrogen). Demonstrate and Quantify Cradle-To-Gate Reductions in Carbon Intensity (Ci, CO2E / KG of Product) of at Least 30% for the Production of Cement, Assuming Substitution of Alumina Oxide from the Recycling Process for Conventional Bauxite, Compared to Cement Produced with Conventionally Mined And/OR Transported Bauxite.

RecipientOutside our Phase 1 contractor set: see methodology
Place of performanceIndiana
Category
Competed?Not recorded✓ from source
Total (exact)$67,314,320

More from Department of Energy

awarded 1993$48.1B
awarded 1978$35.3B
🔎
Why the labels? The graph is only worth anything if the links are trusted. Facts taken straight from a federal filing are ✓ from source; anything we compute or infer (corporate parents, districts, competitors) is ≈ inferred and worded carefully, never asserted as fact.