TheFiscalFinder
Single award · contract

Design-Build of Central Utility Plant Expansion (CUP2), ST Elizabeths West Campus, Se, Wash., DC

A single federal award, with both ends of the trail linked.
$79.4M
total award value
2016
action date
42 mo
period
GS11P17MMC0002
PIID

Description

Igf::ot::igf Design-Build of Central Utility Plant Expansion (CUP2), ST Elizabeths West Campus, Se, Wash., DC

RecipientOutside our Phase 1 contractor set: see methodology
Place of performanceDistrict Of Columbia
Competed?Not recorded✓ from source
Total (exact)$79,385,175

More from General Services Administration

awarded 2022$1.2B
🔎
Why the labels? The graph is only worth anything if the links are trusted. Facts taken straight from a federal filing are ✓ from source; anything we compute or infer (corporate parents, districts, competitors) is ≈ inferred and worded carefully, never asserted as fact.