● Single award · contract
Design-Bid-Build of Three Rivers Phase 2 Hydraulic Containment Structure and Modifications to Owens Lake and…
A single federal award, with both ends of the trail linked.
$109.5M
total award value
2024
action date
37 mo
period
W9127S25C0001
PIID
Description
Design-Bid-Build of Three Rivers Phase 2 Hydraulic Containment Structure and Modifications to Owens Lake and LA Grues Lake Culverts. Work Will Include, But Not Limited to, Activities Such as Clearing, Grubbing, Excavation and Haul Roads.
Awarding agencyDepartment of Defense →
Place of performanceArkansas →
CategoryNAICS 237990PSC Y1PZ
Competed?Not recorded✓ from source
Total (exact)$109,451,911
More awards to Barnard Construction Company, Incorporated
awarded 2025$761.1M
awarded 2022$201.1M
More from Department of Defense
awarded 2016$51.3B
awarded 2017$35.1B
awarded 2017$34.9B
awarded 2001$34.2B
awarded 2011$32B
🔎
Why the labels? The graph is only worth anything if the links are trusted. Facts taken straight from a federal filing are ✓ from source; figures we calculate are ≈ computed; links we infer (corporate parents, districts, competitors, connections between records) are ≈ inferred, worded carefully, never asserted as fact and never a claim that one thing caused another. Spot an error? Tell us.