Single award · contract
DDG 1002 Diminishing Manufacturing Sources (DMS) Materials and Long-Lead/Advanced Procurement Items, DDG 1000…
Award ID: N0002410C5126
A single federal award, with both ends of the trail linked.
$1.3B
Total award value
Award N0002410C5126 is a contract from the Department of Defense to Raytheon Company, $1.3B obligated, FY2010 to FY2022, for DDG 1002 Diminishing Manufacturing Sources (DMS) Materials and Long-Lead/Advanced Procurement…. The work is performed in Massachusetts. It is classified as NAICS 334511 (Search, Detection, Navigation, Guidance, Aeronautical, and Nautical System and Instrument Manufacturing) and PSC 1230 (Fire Control Systems, Complete). Source
Agency ›
Department of Defense
Source
awarded→$1.3B
Recipient ›
Raytheon Company
Source
performed in→
Description
DDG 1002 Diminishing Manufacturing Sources (DMS) Materials and Long-Lead/Advanced Procurement Items, DDG 1000 Class Training Equipment and Curriculum, and Associated DDG 1000 Class Engineering Services
Award details
Award typeContract
PIIDN0002410C5126
Action date2010
Period147 mo
Awarding agencyDepartment of Defense →
RecipientRaytheon Company →
Place of performanceMassachusetts →
CategoryNAICS 334511PSC 1230
Competed?Not recordedSource
Total (exact)$1,341,505,621
More awards to Raytheon Company
awarded 2005$5.7B
awarded 2022$999.1M
awarded 2017$775.7M
awarded 2026$500.1M
More from Department of Defense
awarded 2016$51.3B
awarded 2017$35.7B
awarded 2017$35.1B
awarded 2001$34.2B
awarded 2011$32B
Why the labels? The graph is only worth anything if the links are trusted. Facts taken straight from a federal filing are Source; figures we calculate are Computed; links we infer (corporate parents, districts, similar contractors, connections between records) are Inferred, worded carefully, never asserted as fact and never a claim that one thing caused another. Spot an error? Tell us.