Single award · contract

Construct a Replacement Hospital at Fort Irwin, CA to Provide New Tertiary Care, Emergency Medicine, Clinical…

Award ID: W912PL12C0005

A single federal award, with both ends of the trail linked.

$236.2M
Total award value

Award W912PL12C0005 is a contract from the Department of Defense to Turner Construction Company, $236.2M obligated, FY2012 to FY2021, for Construct a Replacement Hospital at Fort Irwin, CA to Provide New Tertiary Care, Emergency…. The work is performed in California. It is classified as NAICS 236220 (Commercial and Institutional Building Construction) and PSC Y1DA (Construction of Hospitals and Infirmaries). Source

Description

Construct a Replacement Hospital at Fort Irwin, CA to Provide New Tertiary Care, Emergency Medicine, Clinical Support Activities, and Renovation of Existing Mary Walker Clinic. Vacated Facilities Will Be Demolished. Supporting Facilities Include Utilities, Site Improvements, Parking, Access Roads, Signage and Environmental Protection Measures. The Project Will Be Designed in Accordance with Criteria Prescribed in 000 Unified Facilities Criteria (Ufc) 4 -510-01, World Class and Evidence Based Design Principles, 000 Minimum Anti Terrorism Standards for Buildings Ufc 4-010-01, Barrier-Free Design in Accordance with DOD Criteria and the Depsecdef Memorandum "Access for People with Disabilities Act Dated October 31 2008, Base Architectural Guidelines, and Applicable Energy Conservation Legislation. Enhanced Commissioning, Operations and Maintenance (O&m) Manuals, Comprehensive Interior Design (Cid), and Construction (Doc) Will Be Provided. Demolish 5 Buildings (106,950 Total Sf).

Award details

Award typeContract
PIIDW912PL12C0005
Action date2012
Period110 mo
Place of performanceCalifornia →
Competed?Not recordedSource
Total (exact)$236,243,158

More awards to Turner Construction Company

awarded 2019$116.5M

More from Department of Defense

awarded 2016$51.3B
awarded 2001$34.2B
Why the labels? The graph is only worth anything if the links are trusted. Facts taken straight from a federal filing are Source; figures we calculate are Computed; links we infer (corporate parents, districts, similar contractors, connections between records) are Inferred, worded carefully, never asserted as fact and never a claim that one thing caused another. Spot an error? Tell us.