Single award · contract

CH-53K LRIP Lot 1 Long Lead Items

Award ID: N0001916C0048

A single federal award, with both ends of the trail linked.

$2.7B
Total award value

Award N0001916C0048 is a contract from the Department of Defense to Sikorsky Aircraft Corporation, $2.7B obligated, FY2016 to FY2027, for CH-53K LRIP Lot 1 Long Lead Items. The work is performed in Connecticut. It is classified as NAICS 336411 (Aircraft Manufacturing) and PSC 1520 (Aircraft, Rotary Wing). Source

Award details

Award typeContract
PIIDN0001916C0048
Action date2016
Period129 mo
Place of performanceConnecticut →
Competed?Not recordedSource
Total (exact)$2,659,262,026

More awards to Sikorsky Aircraft Corporation

awarded 2006$6.1B
awarded 2014$6B

More from Department of Defense

awarded 2016$51.3B
awarded 2001$34.2B
Why the labels? The graph is only worth anything if the links are trusted. Facts taken straight from a federal filing are Source; figures we calculate are Computed; links we infer (corporate parents, districts, similar contractors, connections between records) are Inferred, worded carefully, never asserted as fact and never a claim that one thing caused another. Spot an error? Tell us.