CH-53K FRP Lot 7 Long Lead Items
Award ID: N0001922C0004
FY2022 · complete year · data as of 2026-07-11
A single federal award, with both ends of the trail linked.
$3.4B
Total award value
Award N0001922C0004 is a contract from the Department of Defense to Sikorsky Aircraft Corporation, $3.4B obligated, FY2022 to FY2029, for CH-53K FRP Lot 7 Long Lead Items. The work is performed in Connecticut. It is classified as NAICS 336411 (Aircraft Manufacturing) and PSC 1520 (Aircraft, Rotary Wing). Source
Award details
Award typeContract
PIIDN0001922C0004
Action date2021
Period84 mo
Awarding agencyDepartment of Defense →
RecipientSikorsky Aircraft Corporation →
Place of performanceConnecticut →
CategoryNAICS 336411PSC 1520
Competed?Not recordedSource
Total (exact)$3,431,922,896
More awards to Sikorsky Aircraft Corporation
awarded 2012$11.6B
awarded 2006$6.1B
awarded 2014$6B
awarded 2017$5.6B
More from Department of Defense
awarded 2016$51.3B
awarded 2017$35.7B
awarded 2017$35.1B
awarded 2001$34.2B
awarded 2011$32B
Why the labels? The graph is only worth anything if the links are trusted. Facts taken straight from a federal filing are Source; figures we calculate are Computed; links we infer (corporate parents, districts, similar contractors, connections between records) are Inferred, worded carefully, never asserted as fact and never a claim that one thing caused another. Spot an error? Tell us.