● Single award · grant
Broadband Infrastructure Deployment Project Proposes to Install Fiber Connecting the 700 Students in Grades…
A single federal award, with both ends of the trail linked.
$57.3M
total award value
2022
action date
58 mo
period
NT22TBC0290054
FAIN
Description
The Broadband Infrastructure Deployment Project Proposes to Install Fiber Connecting the 700 Students in Grades 7-12 from the 19 Pueblos, Navajo and Apache Tribes of New Mexico, Zuni Tribe, Pueblo of Acoma, Pueblo of Isleta, Pueblo of Jemez, Pueblo of Santo Domingo, and the Pueblo of Zia with Fiber-To-The-Home 1 Gbps/I Gbps Service.
Awarding agencyDepartment of Commerce →
RecipientOutside our Phase 1 contractor set: see methodology
Place of performanceNew Mexico →
Category—
Competed?Not recorded✓ from source
Total (exact)$57,298,683
More from Department of Commerce
awarded 2009$1.8B
🔎
Why the labels? The graph is only worth anything if the links are trusted. Facts taken straight from a federal filing are ✓ from source; anything we compute or infer (corporate parents, districts, competitors) is ≈ inferred and worded carefully, never asserted as fact.